अग्निशमन सेवा सप्ताह– 14 से 20 अप्रैल तक "Fire loss is National Loss – Let us adopt Fire Safety Measures" "आग से हानि राष्ट्रीय नुकसान – आइए मिलकर अग्नि सुरक्षा उपायों को अपनायें "

Performa of application for Pre-Operational NOC

* Timeline 30 days
* All fields are mandatory
* Required Documents
1. Map duly approved by competent authority (SIDA/MDDA/HRDA/DDA/Jila Panchayat/Regulated area development authority/ CEO cantonment board) in which all the previously suggested fire safely measures have been successfully demonstrated.
2. List of existing fire safety equipment in building/premises as per the NBC and its working condition.
3. Copy of previously issued Fire NOC (if issued previously)





Approved MAP from concerned authority
NA
Checklist of Fire equipments
NA
No Objection Certificate - Fire
NA

You have not uploaded documents with Status NA. Please visit Investuttarakhand.com to upload them